Friday, April 3, 2009

It's April--where are we now?

The remodeling company is done with the drywall, painting, doors, and cabinets. From the beginning of the year until now. Carpet needs to be installed. and then to check if the mortgage company wants to send an inspector.

Then to finish cleanup of the unfinished side. To arrange the storage. and then to move stuff back down to the basement. Settle back in.

1 comment:

  1. Vacuumed and mopped the drywall dust. Drywall dust everywhere, goes right thru the vacuum. Mopped it twice. Before the carpet goes in.

    ReplyDelete